Project Background

MACH Energy sought to design and construct a new single branch line off the Muswellbrook to Ulan mainline, leading to a rail loop at MTP in order to allow access to the new Train Load Out (TLO) facility. Compliance with the Australian Rail Track Corporation (ARTC) was required as well as compliance with the subsequent standards and requirements, for tie-in with the mainline and the rail loop.

BGC contracting also undertook extensive earthworks and drainage works. This involved construction of the New Rail Loop, access roads, Bridges (Over existing carriage ways), re-alignments, cess drainage, installation of concrete culverts and headwalls, spoil removal and clearing. Rhomberg Rail were contracted for the specialized track construction